Capital Improvements Warrant Article #2 Information
Exterior door replacements at Gilbert H. Hood and East Derry are needed due to wear and damage and to improve security, insulation, and functionality. Additionally, both interior and exterior doors at Grinnell, Barka, and West Running Brook require replacement to address deteriorating conditions, improve safety, and enhance energy efficiency.
$1,166,000
Window replacement at Gilbert H. Hood, South Range, and Grinnell is necessary due to damaged, aging windows that compromise energy efficiency, security, and comfort.
$3,333,000
The roofs at South Range, Grinnell, East Derry, and Gilbert H. Hood schools require replacement due to age-related deterioration and damage from weather exposure, which has compromised their integrity. This replacement is essential to prevent leaks, water damage, and ensure a safe and functional environment for students and staff.
$3,815,000
Chimney investigation and repair at Grinnell is required to address structural damage and ensure proper operation, safety, and prevent potential hazards.
$44,000
During the roofing replacement at West Running Brook, investigation was performed into the existing roof drain system. It was determined that the roof drains need to be replaced to prevent water damage, protect building integrity, and ensure proper drainage.
$288,650
The original brick façade installed in the late 1960s at South Range School is separating from the CMU behind it and requires replacement.
$3,304,000
The concrete banding at West Running Brook requires replacement due to cracking, delamination, spalling, displacement, bowing, and failed mortar joints.
$2,589,616
HVAC replacement at South Range is necessary to address outdated and inefficient systems ensuring a more comfortable and energy-efficient environment.
$3,300,000
Project | Project Totals | East Derry | Barka | Hood | Grinnell | South Range | West Running Brook |
Doors | $1,166,000 | $88,000 | $110,000 | $88,000 | $275,000 | $605,000 | |
Windows | $3,333,000 | $803,000 | $550,000 | $1,980,000 | |||
Roofs | $3,815,000 | $715,000 | $800,000 | $700,000 | $1,600,000 | ||
Chimney | $44,000 | $44,000 | |||||
Roof Drains | $288,650 | $288,650 | |||||
Facade | $3,304,000 | $3,304,000 | |||||
Concrete Banding | $2,589,616 | $2,589,616 | |||||
HVAC | $3,300,000 | $3,300,000 | |||||
EDS Total | EPB Total | GHH Total | GRS Total | SRS Total | WRB Total | ||
Project Subtotal | $17,840,266 | $803,000 | $110,000 | $1,691,000 | $1,569,000 | $10,184,000 | $3,483,266 |
15% Soft Costs | $2,676,040 | ||||||
15% Construction Management | $2,676,040 | ||||||
10% Contingency | $1,525,065 | ||||||
Reduce soft consts/construction mgt./contingency on roof drains | -$115,460 | ||||||
Warrant Total | $24,601,951 |