Capital Improvements Warrant Article #2 Information 

image of doors

Exterior door replacements at Gilbert H. Hood and East Derry are needed due to wear and damage and to improve security, insulation, and functionality. Additionally, both interior and exterior doors at Grinnell, Barka, and West Running Brook require replacement to address deteriorating conditions, improve safety, and enhance energy efficiency.

$1,166,000

Image of decaying windows

Window replacement at Gilbert H. Hood, South Range, and Grinnell is necessary due to damaged, aging windows that compromise energy efficiency, security, and comfort.

$3,333,000

Image of school rooftops

The roofs at South Range, Grinnell, East Derry, and Gilbert H. Hood schools require replacement due to age-related deterioration and damage from weather exposure, which has compromised their integrity. This replacement is essential to prevent leaks, water damage, and ensure a safe and functional environment for students and staff.

$3,815,000

Image of a chimney on a school

Chimney investigation and repair at Grinnell is required to address structural damage and ensure proper operation, safety, and prevent potential hazards.

$44,000

Image of a roof drain

During the roofing replacement at West Running Brook, investigation was performed into the existing roof drain system. It was determined that the roof drains need to be replaced to prevent water damage, protect building integrity, and ensure proper drainage.

$288,650

Image of brick facade on school

The original brick façade installed in the late 1960s at South Range School is separating from the CMU behind it and requires replacement.

$3,304,000

Image of concrete banding on school building

The concrete banding at West Running Brook requires replacement due to cracking, delamination, spalling, displacement, bowing, and failed mortar joints.

$2,589,616

Image of HVAC unit on the school roof

 HVAC replacement at South Range is necessary to address outdated and inefficient systems ensuring a more comfortable and energy-efficient environment.

$3,300,000

Project Project Totals East Derry Barka Hood Grinnell South Range West Running Brook
Doors $1,166,000 $88,000 $110,000 $88,000 $275,000   $605,000
Windows $3,333,000     $803,000 $550,000 $1,980,000  
Roofs $3,815,000 $715,000   $800,000 $700,000 $1,600,000  
Chimney $44,000       $44,000    
Roof Drains $288,650           $288,650
Facade $3,304,000         $3,304,000  
Concrete Banding $2,589,616           $2,589,616
HVAC $3,300,000         $3,300,000  
    EDS Total EPB Total GHH Total GRS Total SRS Total WRB Total
Project Subtotal $17,840,266 $803,000 $110,000 $1,691,000 $1,569,000 $10,184,000 $3,483,266
15% Soft Costs $2,676,040            
15% Construction Management $2,676,040            
10% Contingency $1,525,065            
Reduce soft consts/construction mgt./contingency on roof drains -$115,460            
               
Warrant Total $24,601,951            

 