Drain Replacement

Image of a school building roof drain

During the roofing replacement at West Running Brook, investigation was performed into the existing roof drain system. It was determined that the roof drains need to be replaced to prevent water damage, protect building integrity, and ensure proper drainage. Budgeted amount: $288,650

Drain Replacement Timeline

 

RFP Posted

???

 

Bid Awarded

???

 

Construction Begins

???

Photographs

 

Presentations and Documents